⚠ ACTIVE ALERTS
T-05: Gearbox bearing vibration 8.2g (threshold: 5.0g) — IMMEDIATE INSPECTION REQUIRED  |  T-03: Converter DC-link ripple 5.8% (threshold: 5.0%) — SCHEDULE MAINTENANCE  |  T-08: Blade pitch actuator response degraded 340ms→890ms — MONITOR  |  Fleet: Wind curtailment event at 23.4 m/s — PROTOCOL ACTIVE  |  T-12: Transformer partial discharge event #0x4A2F — LOGGED  |  System: Predictive model retrain complete — 94.2% accuracy — NOMINAL
Offshore Wind Turbine Maintenance
Savings Generated by
ANN.Energy Services
+£18.23M
Present Day Scenario
(~Overall Losses Per Month )
-£40.20M
Fleet Health Score
OPERATIONAL
Online
10/12
Capacity Factor
41.8%
Wind Now
12.0 m/s
Grid Freq
50.012 Hz
North Sea Wind Farm — Live Map
LIVE
Expected vs Actual Output
Energy Loss (Fault-Attributed)
-12.4 MWh
Daily Energy Output
Remaining Useful Life — T-05
810 HRS
Failure Probability Forecast
38.4%
📉 Component Degradation Curve
Grid Voltage
33.1 kV
Current
421 A
Frequency
50.01 Hz
Power Factor
0.962
🌊 Wind Speed Distribution
🌡 Ambient Temperature
Wind Direction Rose
Live Fault Feed
5 ACTIVE
📊 Harmonic Spectrum (FFT)
Vibration Signature — T-05
ABNORMAL
£ Reactive vs Predictive Maintenance Cost
📅 Maintenance Schedule
2026-03-18 · UPCOMING
T-05 Gearbox Bearing
Emergency replacement — 810h RUL
2026-03-25 · PLANNED
T-03 Converter Service
DC-link capacitor inspection
2026-04-10 · PLANNED
T-08 Pitch Actuator
Hydraulic seal replacement
2026-05-01 · SCHEDULED
Fleet Annual Inspection
12 turbines · 5-day campaign
Offshore Wind Turbine · Digital Twin · Hover Components for Health Data
Component Health Status
⚙ Generator
94%
Temperature68°C
Speed12.4 RPM
Vibration1.2 g
StatusNOMINAL
⚡ Converter
74%
DC Voltage690V
Ripple5.8%
Temperature82°C
StatusWARNING
🔄 Transformer
88%
Ratio690V/33kV
Load78%
Temperature54°C
StatusNOMINAL
AI Recommendation
Schedule Converter inspection within 14 days. DC-link capacitor degradation detected. Predictive replacement prevents estimated £2.3M unplanned downtime.
Investment Opportunity

Funding Progress — £1,000,000 Target

£51,000 Raised
Goal: £1,000,000
5.1%
The Team

Built by Engineers Who Understand Wind





IM
Immam
AS
Asad
Founder




AN
Aniket

Connect With ANN.Energy

We welcome collaboration, research partnerships, and industry conversations.

LinkedIn

Follow our company updates and research progress.

View LinkedIn

Email

Contact the team directly for collaboration or inquiries.

Send Email

Instagram

Follow for updates on offshore wind innovation and predictive maintenance.

View Instagram